Hi everyone.
I know this topic has been discussed but I have yet to find an answer to my specific problem. Here it is:
Currently, I have several events where the date is reflecting a span a of time. Say from Jan 1 1980, to Jan 1 1995. The problem is that I want to switch this event to have a single date. I am not sure why it is defaulting back to a "from 0/00/000 to 0/00/ 0000" format, even when I try to change them all to a specific day.
Any thoughts on what I am missing here, or whether this is a bug in the software?
Thanks in advance.
Ron
I know this topic has been discussed but I have yet to find an answer to my specific problem. Here it is:
Currently, I have several events where the date is reflecting a span a of time. Say from Jan 1 1980, to Jan 1 1995. The problem is that I want to switch this event to have a single date. I am not sure why it is defaulting back to a "from 0/00/000 to 0/00/ 0000" format, even when I try to change them all to a specific day.
Any thoughts on what I am missing here, or whether this is a bug in the software?
Thanks in advance.
Ron