If my developer account expires in 38 days (July 11th), would I be able to continue downloading betas after that date via mirrors since my UDID would be registered already?
By beta 3 things are usually pretty smooth (from my experience at least). I would wait and check with other devs how buggy it is. Based on iOS 7, the first two had bad battery life / instability until a little later in the beta process.
By beta 3 things are usually pretty smooth (from my experience at least). I would wait and check with other devs how buggy it is. Based on iOS 7, the first two had bad battery life / instability until a little later in the beta process.