Become a MacRumors Supporter for $50/year with no ads, ability to filter front page stories, and private forums.

KevinWhite

macrumors newbie
Original poster
[Update] - Price dropped for limited time, 0.99$ now at https://itunes.apple.com/app/id879291053

Work Breakdown Structure(WBS) maintenance on outline and chart views, to layout work packages and update estimate by gestures. And supports to export as PDF, Excel and images files, to sync WBS across multiple devices, and to export as project plan to QuickPlan.

WBSGif.gif

WBS is a hierarchical and incremental decomposition of the project into phases, deliverables and work packages. It is a tree structure, which shows a subdivision of effort required to achieve an objective, for example a program, project and contract.

ad4-1024x768.png

Mobilinked WBS, is THE easy to use WBS management app for the iPad. Natural gestures use on a clean user interface makes WBS maintenance easier, faster and more efficient than ever before. Visualize and simplify WBS on outline and graphics chart views, divide work elements, sketch out labor cost, materials cost and total cost of each elements (and automatically adds the costs up the element hierarchy) – with supports of continuous inputting and batch inputing.

WBS can be synchronized across multiple devices and teams, via Email, Airdrop and third party cloud apps, plus exported as image, Excel and PDF files, AND Exported as project plan to QuickPlan(https://itunes.apple.com/app/id621375878)

---------
Video Link: http://youtu.be/FZ7puht7Nao
iTunes Link: https://itunes.apple.com/app/id879291053
---------
 
Last edited:
WBS 2.0 is coming

WBS 2.0 continuously focus on improving maintenance efficiency, work elements can be imported from MS Excel file. Also WBS starts to support task icon with display options.

* Move work element - Change work element sequence on outline view by gesture
* Import from MS Excel - Import work elements from MS Excel file (.xlsx file)
* Work element icon - Add icon to work element, with option to show/hide icons on chart view
* Currency display option
* New UI operation options – Behaviour when added a new work package on chart view
* UI adjustment for iPad 2 – Adjust font to display text better on iPad 2
* Performance improvement


QP_WBS-1024x676.png
 
Register on MacRumors! This sidebar will go away, and you'll see fewer ads.