Update...
Ordered: 11 October 2004
Original/Current ship on or before date: 17 November 2004
Received shipment notice: 8 November 2004
Ordered from: Boulder, Colorado (ship to same) via Web order
Arrived from Elk Grove, CA, 9 November 2004
G5, 2.5 GHz, Bluetooth, 512 MB, 250 GB, SuperDrive, NVIDIA 6800 Ultra, modem
I had a few glitches with additional RAM installation and second HD installation. In the first case, I just reseated the modules. In the second, I had to "tighten" the SATA cable to main logic board connections.
Everything working so far. I feel for those of you waiting in Europe. At least you don't have the political mess there that we have here....
-Dave
Ordered: 11 October 2004
Original/Current ship on or before date: 17 November 2004
Received shipment notice: 8 November 2004
Ordered from: Boulder, Colorado (ship to same) via Web order
Arrived from Elk Grove, CA, 9 November 2004
G5, 2.5 GHz, Bluetooth, 512 MB, 250 GB, SuperDrive, NVIDIA 6800 Ultra, modem
I had a few glitches with additional RAM installation and second HD installation. In the first case, I just reseated the modules. In the second, I had to "tighten" the SATA cable to main logic board connections.
Everything working so far. I feel for those of you waiting in Europe. At least you don't have the political mess there that we have here....
-Dave