Originally posted by fahlman
Steve never said, to the to the best of my knowledge, that the G5 would reach 3GHz withing one year. He promised that Macintoshes would be operating at 3GHz in one year, never stating which processor it would be.
You may be right. I think Steve made the 3GHz remark for several reasons (caution: this is speculation on my part):
1. The PPC 970 on a 130nm process was not what he really wanted, but he needed something to pit against the Intel juggernaut and establish credibility for Apple's high-end hardware.
2. He would have preferred to introduce the first G5s based on a 90nm process. I don't know how much power the 130nm 2GHz G5 consumes, but the 130nm 2.5 GHz model is thought to consume 96 watts (
www.appleinsider.com/news). IBM's 300mm fab at the time was not ready and was in fact having yield problems with 130nm. It takes time to introduce and stabilize a new process technology.
3. The current crop of G5s seem (to me) to be a stop-gap release. Hence, Apple will probably (none of
us really know) keep the G5 name as it introduces the 3 GHz models in order to show confidence and longevity in the "G5" strategy. Similarly, Intel has remained at "Pentium 4" for a handful of years and has continued to make incremental improvements to its architecture. Remember when Intel first introduced the P4? Most people thought they were obsoleting the Pentium III too quickly, and large corporations running mission critical software balked at the idea of having to re-qualify their systems with the new processor.
While Apple is not nearly as affected by concerns over software compatibility with next-gen CPUs, my guess is that they will likely keep the G5 name, for a couple of years, to represent their high end.
Again, this is all speculation.