Become a MacRumors Supporter for $50/year with no ads, ability to filter front page stories, and private forums.
Nothing will be better for complex music work than an 8-core Mac Pro. I admire your courage to realize the 4-core Mac Pro was more of a stop gap model than what the market needs longer term.

What's funny is that the 8-core Mac Pro will be more of a stop-gap model. After all, the Clovertown is two Woodcrest CPUs on the same die, but still running off the same FSB bandwidth and the first pair of cores must utilize the FSB to transfer data to the second pair of cores and vice versa. We won't see unified quad-core CPUs until sometime next year along with the multiplexed/bonded (and faster base rate) FSB implementations. ...AMD will be shipping fully unified quad-core CPUs in mid-December to early January. Not that it matters since Apple isn't using them.

Anyway, it's just another evolutionary step... Buy what you need when you need it and that's all there is to it.
 
Buy what you need when you need it and that's all there is to it.

That really is the truth. My dual 3.0 xeon will not be the top dawg within months, most likely, but I had to get it in order to finish this film and, as importantly, to bump my old top dawg Dual 2.0 G5 to my prep/photoshop/audio machine. My workflow involves two machines and my old MDD Dual 1.25 was the one that really needed to go.

I'm fine with four cores for now and, in a year or two, whenever I can justify a new machine, the Dual 3.0 will get knocked off the perch and I'll get the latest and greatest. I just wish that RAM and peripherals didn't add so much to the cost of a production machine these days, but that's life.
 
Know your workload. Do you use applications that are multi-core aware? Do you want to run them simultaneously? Do you want to run several applications simultaneously - each doing work at the same time? Leopard is bound to be very multi-core friendly since 4 cores will be the norm when it ships.

Since you have hung on to the Dual 2GHz model for far past its hayday, I'm thinking you don't need 8 cores. I had a Dual 2GHz G5 back in '04 and got the 2.5 soon as it went refurb early '05. By early '06 I was in a panic with not enough power to do my Multi-Threaded Workload. I was in a cold sweat when I ordered the Quad G5 in early February.

I found its limit within a few months and have been enthusiastically awaiting these 8-core Dual Clovertown Mac Pros since before the 4-core Mac Pro shipped.

Since that does not describe you, you may be happy with the 4 core Mac Pro. But if you can afford it and you do Video, 3D work, lots of heavy Photoshop processes and/or want to run a bunch of single core processes simultaneously in the course of a day and/or nights, you would be much better off in the long run with the upcoming 8-core. Figure with RAM it will run you around or above $4k. Does that work for you?

Oh, and I'm not selling my Quad G5 either. :)

Yah, I'm in the same boat BUT I still have my dual G5 2.0 from June '03. You must do a lot of intense processing! Mine still runs great, works fine for me (graphic designer by profession, FCP editor + 3D rendering for fun in Strata CX 4.2). Honestly, FCP could be faster, but I think it is mainly because I am not running a raid and I only have 1.5 GB RAM.

First of all, I think I qualify for some medium to hard data crunching and I can vouch that my dual 2.0 is still a great workhorse. I do plan on waiting for the 8 cores to upgrade so I can be ontop again, (it felt good to have the fastest mac for a while!!!) I also didn't think the Mac Pro was worth the money for me because the PPC software slowdown (for real world tests in CS2, I was running around the same speed). I am also very ready for CS3. I just figure I've waited this long, why not wait a little more . . . though trying to get any $$ for my G5 is going to be hard.

In the 6 pages of threads I read so far, I honestly can say that the 8 cores are going to be awesome, though I hope they offer a 3Ghz model. Anandtech showed that even the Quad Mac Pro was beat at daily office crunching by the Intel Core 2 Extreme. Ofcourse for multithread, the quad wins but it does show that Ghz still plays a significant role in overal performance, like we all know.

One comment about the FSB: the more truly 64 bit we go, especially with leopard, the more taxed the FSB will become (by pulling gobs of memory at 64 bit addresses). We really haven't done this yet, but I heard computers could actually go slower because of this.

SO, I'm banking on the 8 cores having a faster bus and *wish*wish* being able to support PC graphic cards in crossfire nativly without having to flash the rom . . . you do know, Apple was the first to offer dual graphic cards years ago . . .in a crossfire like fashion? Let's get that back with another 16 lane slot:)
 
Music Software Is Being Re-Written For More Cores Right Now

Can you elaborate on that? I have a pending Mac Pro purchase for my recording studio, based on Pro Tools, and I can't decide if I would benefit from the additional cores. I know Pro Tools can't utilize more then 2 at a time, but I'm wondering if all the additional processing (virtual effects, instruments, etc) would get a boost...
Think long term. All the pro software is being re-written right now to take advantage of more cores at once. So short term you're right. But knowing how processor intensive music applications in particular are, not unlike video application compression work, you're gonna be glad you waited for the 8-core intstead - if you can wait since we don't really know the WHEN part for sure. Guessing November 14th don't make it so til the release hits the web. :)
 
Dual Clovertown Is Stop Gap 8-Core 'Til Real 4 FSB Models Catch Up

What's funny is that the 8-core Mac Pro will be more of a stop-gap model. After all, the Clovertown is two Woodcrest CPUs on the same die, but still running off the same FSB bandwidth and the first pair of cores must utilize the FSB to transfer data to the second pair of cores and vice versa. We won't see unified quad-core CPUs until sometime next year along with the multiplexed/bonded (and faster base rate) FSB implementations. ...AMD will be shipping fully unified quad-core CPUs in mid-December to early January. Not that it matters since Apple isn't using them.

Anyway, it's just another evolutionary step... Buy what you need when you need it and that's all there is to it.
Yeah I know. So are you thinking the Dual Clovertown may be a dog 'cause both sets of four cores have to share one bus each? If it won't really run faster what's the point? I hope that isn't going to be a problem for "simple" video compression work which is all I want it for.
 
This discussion is rather amusing in a way - "don't buy 4 cores, wait for 8 cores!" etc. - yeah, and in a few months it'll be "don't buy 8 cores, wait for 16 cores!" and then 32 cores, blah blah, ad infinitum... :p ;) :D :cool:
 
Just Compress Video Faster Than A 4-Core Mac Pro Please

This discussion is rather amusing in a way - "don't buy 4 cores, wait for 8 cores!" etc. - yeah, and in a few months it'll be "don't buy 8 cores, wait for 16 cores!" and then 32 cores, blah blah, ad infinitum... :p ;) :D :cool:
No kidding. :rolleyes: All I want is to compress video faster than I can with the 4-core Mac Pro - that's IT. So if it won't do that, I'll just have a cow and go to bed for six months. :eek:
 
Yeah I know. So are you thinking the Dual Clovertown may be a dog 'cause both sets of four cores have to share one bus each? If it won't really run faster what's the point? I hope that isn't going to be a problem for "simple" video compression work which is all I want it for.

I think for most tasks the extra cores will be beneficial - especially once software catches up and can properly take advantage. But I can see bandwidth-intensive applications having trouble. Uncompressed video editing and compositing could hit a bottleneck here when running several streams at 1080p or 2K ~ 4K film res. I'm personally not too worried about it with most of the work I do, which is 3D rendering and that's farily low-bandwidth with lots of intense calculations. I do quite a bit of video work and lots of editing of my animation output, but even at HD resolutions I don't usually work with enough streams or simultaneous sources to saturate my bus bandwidth. Or at least the bus hasn't become a bottleneck for my G5 Quads or Quad Opteron systems just yet. ...Or should I say the software hasn't allowed it to be. But I'm eagerly awaiting the 8-core Macs and I'm hoping Apple may bring a few other upgrades to the config page with the next update. It's starting to look like a new Mac Pro isn't in the budget for this year, but who knows. I'm planning to buy one if I can...
 
Yeah I know. So are you thinking the Dual Clovertown may be a dog 'cause both sets of four cores have to share one bus each? If it won't really run faster what's the point? I hope that isn't going to be a problem for "simple" video compression work which is all I want it for.

FBDIMMs are designed for maximum bandwidth, not for best possible latency, so they cope with this better than any other kind of memory. You may read that bandwidth is the bottleneck for these processors. However, that is only the case for pure copying operations. Code that calls memcpy () on all eight cores simultaneously will run out of steam quite quickly. However, most code does actually do some work with that data (like video compression), and the bandwidth won't be that big a problem.

Lets say you compress a two hour dual layer DVD with Handbrake at 1 Megabit per second. DVD = 9.5 GB takes ages to read from DVD, takes about two seconds to copy in memory. Copying the 1 Megabit takes two dozen microseconds. Most of the action will happen in L2 cache, so you should be fine.
 
I Don't Rip Anything From DVDs - Only DVD Images On The Hard Drives

FBDIMMs are designed for maximum bandwidth, not for best possible latency, so they cope with this better than any other kind of memory. You may read that bandwidth is the bottleneck for these processors. However, that is only the case for pure copying operations. Code that calls memcpy () on all eight cores simultaneously will run out of steam quite quickly. However, most code does actually do some work with that data (like video compression), and the bandwidth won't be that big a problem.

Lets say you compress a two hour dual layer DVD with Handbrake at 1 Megabit per second. DVD = 9.5 GB takes ages to read from DVD, takes about two seconds to copy in memory. Copying the 1 Megabit takes two dozen microseconds. Most of the action will happen in L2 cache, so you should be fine.
Thank you for the positive feedback. But I don't rip anything from DVDs much at all. I crush EyeTV2 broadcast recordings with Toast 7.1 (UB) to DVD Images on hard drives. Then I 2-pass rip from those images with Handbrake to mp4 so I'm not having any optical bottleneck at all. From what you say, this should be much faster like I'm hoping with all those cores.
 
I'll May Have To Pass On Extreme Heat Model And Wait For The Sub 100W Models Instead

Oops! This makes me change my mind about buying this Fall:

"HP, and other OEMs, should have Clovertown gear ready on the 14th. Our sources inside HP say the chip is eating between 140 watts and 150 watts..." :eek:

"Intel hopes to deliver less power hungry parts in short order. CEO Paul Otellini has talked about 50W and 80W Clovertown parts set for the early part of 2007." :)

Guess I'm gonna have to be a little more patient a little longer in that case. That will be after MacWorld Expo toward the end of January then. Oh well. So much for immediate gratification. ;) Looks like waiting for the 8-core to ship with Leopard will jive with the cooler less power hungry monsters as well.

Thanks for bursting my bubble. :( I can get back to the business of another longer term wait similar to the wait for Santa Rosa or the mobile C2D MBP that's shipping now after 10 months of mobile CDs. At least it won't be that much longer. :cool: Looks like Clovertown Rev. B will be worth waiting for as well.

My apologies to all who were negatively infected by my extreeme enthusiasm for the first Clovertown release before I understood this new information. I can wait. I know some of you can't.

And I also may change my mind again when/if Apple releases a hot version first. Maybe they'll pass on the 150 watt models. Or perhaps they have real good cooling figured out. But I think I'd rather be ecological and buy what consumes less power anyway - especially in light of only another 2-3 months time.
 
Oops! This makes me change my mind about buying this Fall:

"HP, and other OEMs, should have Clovertown gear ready on the 14th. Our sources inside HP say the chip is eating between 140 watts and 150 watts..." :eek:

"Intel hopes to deliver less power hungry parts in short order. CEO Paul Otellini has talked about 50W and 80W Clovertown parts set for the early part of 2007." :)

Guess I'm gonna have to be a little more patient a little longer in that case. That will be after MacWorld Expo toward the end of January then. Oh well. So much for immediate gratification. ;) Looks like waiting for the 8-core to ship with Leopard will jive with the cooler less power hungry monsters as well.

Thanks for bursting my bubble. :( I can get back to the business of another longer term wait similar to the wait for Santa Rosa or the mobile C2D MBP that's shipping now after 10 months of mobile CDs. At least it won't be that much longer. :cool: Looks like Clovertown Rev. B will be worth waiting for as well.

My apologies to all who were negatively infected by my extreeme enthusiasm for the first Clovertown release before I understood this new information. I can wait. I know some of you can't.

And I also may change my mind again when/if Apple releases a hot version first. Maybe they'll pass on the 150 watt models. Or perhaps they have real good cooling figured out. But I think I'd rather be ecological and buy what consumes less power anyway - especially in light of only another 2-3 months time.

Thanks to all who have invested time to collect and share information on Clovertons.

I have a couple of G5 Quads I was going to upgrade to Clovertons as well. Now, after viewing this short, but informative thread, I too, will wait until Mid-2007 and make the giant leap.

Appreciate everyone's efforts and intelligence.

Dante
CreativeBeans
 
If it's a simple swap of processors, then I would believe the rumors. :) 8-cores, wow! Much much faster than anyone anticipated.
Just who will write the programs for all this parallel processing? It's not simple and full of crashes as one core competes with memory etc. I believe it will be a long time before programming will catch up to these processors. That doesn't make them worth the money just yet.;)
 
Just who will write the programs for all this parallel processing? It's not simple and full of crashes as one core competes with memory etc. I believe it will be a long time before programming will catch up to these processors. That doesn't make them worth the money just yet.;)

Evidently you haven't read the myriad of posts in this thread regarding multi-threaded workflows... :rolleyes: :cool:
 
Well then color me crazy and put me back on the bus! I'm all about the top speed 2.66GHz model and nothing else. :p

We won't see lower power 4-core offerings until Intel goes 45nm with a unified core design. 45nm should take them to 8-core, maybe 16 or even 24, but Intel doesn't seem too sure just yet.
 
The hungry ghost?

If one follows the link,
the cooler Clovertons are much lower GHz.

Can't seem to find the above mentioned statement..
so its saying that the 2.66 won't be too power hungry in contrast to the higher models..?
Does this revive the whole 8-core excitement.. (multimedia) Do we still see a release this month.. worth purchasing?

Or are we still at the point.. where waiting till first quarter 07 is a better bet.?

I really need to make my mind up on when to buy :confused:
 
November 14 Release & Shipping Immediately Most Likely Date Before January

Can't seem to find the above mentioned statement..
so its saying that the 2.66 won't be too power hungry in contrast to the higher models..?
Does this revive the whole 8-core excitement.. (multimedia) Do we still see a release this month.. worth purchasing?

Or are we still at the point.. where waiting till first quarter 07 is a better bet.?

I really need to make my mind up on when to buy :confused:
I'm back where I was to begin with, ready to buy the 2.66GHz release I hope will happen Tuesday November 14. The lower power ones will also be slower with a slower FSB as well. I forgot to remember that.

Seems like next Tuesday November 7 will be the date for MacBook/mini C2D release. So that leaves only Tuesday November 14 right after Intel says Clovertowns are shipping because the following week is Thanksgiving-Black Friday. If it doesn't happen then, I imagine we're gonna have to wait for MacWorld Expo. :(

This is all me just guessing you understand.
 
I'm back where I was to begin with, ready to buy the 2.66GHz release I hope will happen Tuesday November 14. The lower power ones will also be slower with a slower FSB as well. I forgot to remember that.
I wouldn't expect the Clovertowns to be a BTO option right away. Sure they are pin compatable but Apple will need to make sure that they can cool these chips well enough to be very stable. Maybe Apple has already been testing the clovertown config, but we haven't heard any rumors and who knows if they need additional cooling.

I expect Apple to be more conservative than guys like Anand and Tom's hardware. Hopefully there's enough cooling "headroom" already built into the Mac Pro.

Also, who knows if the chip yield is high enough to trickle down to Apple? I honestly haven't heard much on their expected ship numbers.
 
We won't see lower power 4-core offerings until Intel goes 45nm with a unified core design. 45nm should take them to 8-core, maybe 16 or even 24, but Intel doesn't seem too sure just yet.
This page from Anandtech, describing power consumption on Kentsfield, brings up the issue of independently varying clock frequency and voltage per core, something that is rather tough to implement. Even at 65nm Intel could do what AMD will do in Barcelona, which is to implement independent clocks for each core.
 
The Source Article Of This Thread Says Apple Completed Prep For 8-Core In September

I wouldn't expect the Clovertowns to be a BTO option right away. Sure they are pin compatable but Apple will need to make sure that they can cool these chips well enough to be very stable. Maybe Apple has already been testing the clovertown config, but we haven't heard any rumors and who knows if they need additional cooling.

I expect Apple to be more conservative than guys like Anand and Tom's hardware. Hopefully there's enough cooling "headroom" already built into the Mac Pro.

Also, who knows if the chip yield is high enough to trickle down to Apple? I honestly haven't heard much on their expected ship numbers.
The Source Article Of This Thread Says Apple Completed Preperation For 8-Core In September. According to the Merom and Conroe release quantities, it will be a lot when they say they are shipping.

"The Mac Pro new system would come with two Quad-core processors and could be released after mid-November of this year. The exact timing of the release is not clear, but must wait for the official release of Clovertown. . .

It'll be strictly a marketing decision from there, say insiders, as the Mac maker wrapped up hardware preparations for this brawny beast during the tail-end of the back-to-school season."
 
Register on MacRumors! This sidebar will go away, and you'll see fewer ads.